Mobile
Log In Sign Up
Home > english-chinese > "drilling shaft" in Chinese

Chinese translation for "drilling shaft"

钻杆组

Related Translations:
shaft:  n.1.箭;箭杆。2.(枪、槌、斧等的)柄;矛。3.【植物;植物学】秆;茎;柄。4.【动物;动物学】羽轴;羽干。5.(古生物的)主突起茎。6.〔the shafts〕辕;车杠;车把。7.烛台杆;鞭柄;棍棒;旗竿。8.【建筑】柱身。9.(露出屋面的)烟囱。10.轴;旋转轴。11.【冶金】炉身。12.【矿物】矿井;竖坑;通风管道;升降井。13.光线;电光。14.柱;柱身。15.
shafted:  有箭杆的, 有柄的, 有羽轴的
shafting:  n.【机械工程】1.轴系。2.传动轴。3. 轴材。
drill shaft:  排种机轴钻杆,钻柄
drilled shaft:  钻孔竖井钻孔桩井
shaft drilling:  井筒钻凿竖井钻凿
Example Sentences:
1.Boring for centring pins in hollow - drilled shafts of wheel sets
轮副空心钻轴中定心销的镗孔
2.Optimization analysis for the location of the compressive joint for the drilling shaft lining
钻井井壁可缩性接头位置的优化分析
3.Experimental study on mechanical mechanism of retractable drilling shaft lining under the condition of stratum subsidence
地层沉降条件下可缩性钻井井壁受力机理的试验研究
4.Preparation and application of high strength and high performance concrete of drilling shaft lining in special deep alluvium
特厚冲积层钻井井壁高强高性能混凝土配制研究及其应用
5.The high speed drilling shaft and pin cylinder system work at the same reference axis to ensure high work precision and convent operation
高速精密钻孔主轴和钉销气缸系同基准轴线上工作,能保证工作精度高,操作方便。
6.Abstract : artifical intelligence methods are implemented to simulate thebehaviors of axially and laterally loaded piles using the field observation tests data obtain ed f rom the drilled shafts and driven piles . the optimal neural network model is deve loped using only simple input data of spt - n values and piles ' geometrical featu r es etc . . the analysis for r . c piles of some projects is performed adopting the bp n n and grnn models respectively , and the obtained predicated results are compared w ith the data from conventional design method . it demonstrated the obvious advanta ges of neural networks in the design of pile foundations over the traditional me thods . this paper has an important practical significance and a referential worth iness in the design of pile foundations
文摘:根据钻孔桩和打击桩的原型试验观测的数据,运用人工智能方法对横向承载桩和轴向承载桩的工作特性进行模拟,并利用标准贯入试验( spt - n )值和桩的几何特性等简单的输入数据,开发出相应的优化神经网络模型;然后,运用反向传播神经网络模型和广义回归神经网络模型分别对某工程的钢筋混凝土桩进行分析,并将求得的预测结果与常规设计法的结果进行比较,结果表明神经网络方法比传统方法有明显的优越性,在实际工程设计中具有重要的参考价值和现实意义。
7.Works are accomplished as follows in this paper : firstly , according to the real condition of the fourth pier , through analysis of several generally - used anti - slipping schemes , new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping
为此本文主要做了以下工作:首先根据4 #墩基础的具体条件,通过对现有常用的几种抗滑方案的综合比较分析,提出了以工程本身的钻孔桩基础代替锚固柱桩防止钢围堰滑移的方案。
8.Its main span , which is 60m long , is made up of prestressed concrete continuous beam . the fourth pier , one of the main piers , adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex , so the cofferdam has the trend of slippage
渝怀铁路第20标段阿蓬江大桥全长343 . 06m ,主跨为60m的预应力混凝土连续梁, 4 #墩是其一个主墩,基础采用双壁钢围堰与钻孔桩相结合的复合基础。
Similar Words:
"drilling roughness" Chinese translation, "drilling safety" Chinese translation, "drilling scow" Chinese translation, "drilling sequence" Chinese translation, "drilling shafet" Chinese translation, "drilling shift" Chinese translation, "drilling ship" Chinese translation, "drilling sideline and altitude" Chinese translation, "drilling simulator" Chinese translation, "drilling site" Chinese translation